Where each artefact lives, and who is allowed to write it
The industrial structure of the F-35 enterprise, drawn as a target-state data architecture rather than an org chart: one government-held record, one governed boundary, and every partner writing into it from their own tooling.
1The premise, stated plainly
Today the authoritative engineering record of a programme like this effectively lives with the prime, and the government receives deliverables from it. That arrangement is what produces three of the JPO's four stated findings: a stove-piped process, limited visibility into assembled hardware, and dependence on industry that Title 10 pressure now works against.
The target state inverts the direction of custody without pretending the government will do the engineering. The JPO holds the record. Every partner keeps their own authoring tools, their own intellectual property and their own internal process, and writes into the government record across a boundary that is governed rather than negotiated per deliverable.
2Where things live
3Who writes what, and who may change it
The diagram is only meaningful if write authority is explicit. The table is the same picture stated as permissions, which is the form a configuration control board can actually argue with.
| Artefact | Lives in | Written by | Governed how |
|---|---|---|---|
| System and subsystem requirements | JPO record | JPO, proposed by partners | Baseline under government configuration control; partner proposals arrive as change requests, not edits |
| Interface control definitions | JPO record | Jointly, one owner per interface | Every ICD has exactly one accountable owner and both sides subscribe to change |
| Design and analysis models | Partner environment | The owning partner | Stays with the partner. Only the interface view and the evidence cross the boundary |
| Verification evidence | JPO record | Whoever ran the verification | Must cite a re-fetchable managed artefact, or it is rejected rather than filed |
| As-built configuration | JPO record | Manufacturing and depot | Traced to the as-designed baseline it was built against |
| Readiness and coverage | JPO record | Nobody. It is computed | Derived from evidence. Not editable by any party, which is the point |
4How the solution is architected
5What each layer is actually for
Layer 1: the record
Requirements, the ICD registry, configuration baselines, the verification record and the programme plan, held by the government. This is the layer that answers a configuration question without a phone call to a contractor. Teamcenter is the product answer, deployable on premises and capable of running disconnected.
Layer 2: the boundary
The only layer everyone has to agree on, and therefore the one worth standardising hardest. Open interchange formats, an identity and access model, export control and a redaction posture so a partner can supply an interface view without surrendering the model behind it. Get this layer right and layer 3 can be as heterogeneous as the industrial base actually is.
Layer 3: partner environments
Deliberately mixed vendor. Each partner keeps their PLM, their CAD, their EDA and their internal process. The demonstration proves this case rather than assuming it: the system model is authored in a competitor's tool and the thread carries it anyway.
Layer 4: verification services
Five independent techniques, because the JPO's own analysis says one technique reaches 10 to 20 percent coverage. Multi-mode is highlighted because it is the technique that finds the failure in this demonstration and the one where a pure-EDA competitor has no comparable answer.
Layer 5: measurement
Not a dashboard. A computation over the evidence in layer 1, with a stated abstention rule. This is the layer the JPO asked for when it wrote "objective implementation readiness analysis with continuous metrics", and it only works because layers 1 and 2 made the evidence citable in the first place.
6The hard parts, named
An architecture diagram that shows only the parts that work is a sales aid. These are the places this model is genuinely difficult, and they are worth raising before the customer raises them:
- Intellectual property across the boundary. A partner will not put its design models in a government record, and should not be asked to. The model only works if the interface view and the evidence are separable from the design that produced them, and that separation is real engineering work per interface.
- Who owns an interface. Every ICD needs exactly one accountable owner. That is a contractual question before it is a technical one, and it is where this architecture will succeed or fail.
- Evidence provenance across organisations. "Cite a re-fetchable artefact" is easy inside one company and hard across six, because the artefact has to remain fetchable after the programme moves on and possibly after the supplier changes.
- Classification boundaries. Everything on this page is unclassified. A real deployment sits across multiple classification levels, and the exchange layer has to be designed for that from the start rather than retrofitted.